ABB Terra AC W22 MID vs Alfen Eve Single S-line 22kW
Max. charging power (AC): ABB Terra AC W22 MID 22 kW, Alfen Eve Single S-line 22kW 22 kW. The ABB Terra AC W22 MID is better on 2 of 12 comparable points.
Who wins where
- ABB Terra AC W22 MID
- Alfen Eve Single S-line 22kW
Biggest differences
| Fact | Terra AC W22 MID | Eve Single S-line 22kW |
|---|---|---|
| Min. operating temperature | -35 °C | -25 °C |
Score per area = position (0–100) relative to all 67 models in this category; higher is better.
| Technical specifications | ABBTerra AC W22 MID | AlfenEve Single S-line 22kW |
|---|---|---|
| General | ||
| Connector | Tethered cable (Type 2) / Type 2 socket 1 | Tethered cable (Type 2) / Type 2 socket 2 |
| Number of outlets | 1 3 | 1 3 |
| Min. operating temperature | -35 °C ✓ 1 | -25 °C 2 |
| Performance | ||
| Max. charging power (AC) | 22 kW 3 | 22 kW 2 |
| Electrical | ||
| Phases | 3 1 | 3 2 |
| Max. current per phase | 32 A 1 | 32 A 2 |
| Standby power | – | 8 W 2 |
| Connectivity & smart | ||
| OCPP | 1.6J 1 | 1.6J, 2.0.1 (ook 1.5J) 2 |
| OCPP certified (OCA) | – | Yes 2 |
| Wi-Fi | Yes 1 | Yes 2 |
| Ethernet | Yes 1 | Yes 2 |
| 4G/LTE | Yes 1 | Yes 2 |
| RFID card reader | Yes 1 | Yes 2 |
| Display | Yes ✓ 1 | No 2 |
| Dynamic load balancing | Yes 1 | Yes 2 |
| Smart meter (P1) input | – | Yes 2 |
| Safety & metering | ||
| MID-certified meter | Yes 1 | Yes 2 |
| Built-in 6 mA DC leakage detection | – | Yes 2 |
| IP rating | IP54 1 | IP55 2 |
| IK rating | IK10 1 | IK10 2 |
| Dimensions & weight | ||
| Width | 195 mm 1 | 242 mm 2 |
| Height | 320 mm 1 | 373 mm 2 |
| Depth | 110 mm 1 | – |
| Weight | – | 4 kg 2 |
| Grants & market | ||
| OZEV eligible (UK) | Yes 3 | Yes 3 |
Sources
- ABB Terra AC wallbox – brochure, 9AKK107680A2257 Rev. G (12/2024) — ABB E-mobility · accessed 27 Sept 2026
- Alfen Eve Single – datasheet technische specificatie, V1.3 (03/2026) — Alfen ICU B.V. · accessed 27 Sept 2026
- Authorised chargepoint model list — Office for Zero Emission Vehicles (OZEV), GOV.UK · accessed 27 Sept 2026